Plan each row of tongue and groove before installing it.
Tongue and groove flooring installation guide.
If necessary you can apply a layer of vapor barrier to the floor and then you need to roll out.
Be sure that your first board is placed with the tongue edging pointing into the room.
Pro tips for installing tongue and groove flooring prevent wood squeaks by using a sound absorbing underlayment between the subfloor and the hardwood flooring.
Drive 6d or 8d flooring nails through the pilot holes and then drill additional pilot holes through the tongue at a.
The glue must be placed along the topside of the groove the full length of the grooved side and end.
Align the first board with the layout line with the tongue facing into the room.
Cut as needed to fit the row and to ensure each board ends in the middle of a stud or.
Floating floor step 1 underlayment.
Put a 3 4 inch spacer against the.
Pick the board s you wish to use for the row.
Seat the end tongue and groove flooring into each other and.
Step 3 apply glue and attach boards.
Always leave at least a 3 8 expansion space between flooring and all walls and vertical objects such as pipes and cabinets.
Glue and glue placement the recommended glue for floating installation is tongue and groove engineered flooring glue.
Glue placement is very important.